Some illustrations have been repositioned to avoid breaking up the text. Page numbers in the table refer to the original printed volume. Plates were unpaginated; numbers such as “85” or “129” mean “facing page 84“, “facing page 128”. When a Figure took up a full (numbered) page, its page number is shown in italics. They may be slightly out of sequence with nearby page numbers.

PlatePage
XXI.Hackensack Portal, Bergen Hill Tunnels; Method of Using Cross-Section Rod; and Belt Conveyor for Handling and Placing Concrete85
XXII.Scaffold Car; Headhouse; and Round Holes in Concrete Forms87
XXIII.Record of Drilling, Air Pressure, Mucking, etc., in Bergen Hill Tunnels95
XXIV.Belt Conveyor for Handling and Placing Concrete; Water-Proofing, Portion of Completed Sand-Wall, etc.; and Methods of Placing Concrete in Forms and Bench-Walls119
XXV.Telephone and Telegraph Ducts and Mandrels; Tunnel Lining Forms; Placing Water-Proofing; and Section of Completed Lining129
XXVI.Form of Circuit-Breaker Chamber and Traveling Gantry; Forms for Storage Chamber; Rock Packing Over Arches; Method of Water-Proofing in Timbered Tunnels, etc.137
XXVII.Method of Placing Water-Proofing and Keying Arch; View of Completed Tunnel; General View of Completed Hackensack Tunnel and Arches Through Cut-and-Cover Section; and View of Hackensack Approach145
Fig. 1.Drilling Method No. 188
2.Drilling Method No. 289
3.Drilling Method No. 390
4.Drilling Method No. 491
5.Muck Car Used at Weehawken Shaft92
6.Progress Profiles of North and South Tunnels Showing Monthly Excavation93
7.Method of Emptying Dump Cars at Weehawken Shaft98
8.Ventilation System (no caption)101
9.Progress Profile—North Tunnel107
10.Sketch Showing Division of Lining for Purposes of Construction, and Names of Sections115
11.A Cross-Section of Hains Mixer Installation, at Weehawken Shaft
B Cross-Section of Hains Mixer Installation, Stone and Sand Bins Above and Screen of Crusher, at Hackensack Portal
118
12.Details of Traveling Gantry Used in the Construction of the Tunnel Lining121
13.Plan Showing Various Methods of Building Floor and Foundation, and Details of Forms125
14.Traveling Form for Building Sand-Wall128
15.Electrical Conduits: Methods of Laying, Rodding, etc.131
16.Details of Traveling Forms Used in the Construction of the Bench Walls131
17.Sketch Showing Method of Making Arch Closure141
18.Various Types of Arches, and Water-Proofing Used143
19.Bergen Hills Tunnels. Hackensack Portal and Approach. Sections and Elevations.148
20.Organization of Staff of Resident Engineer. Organization Previous to the Holing Through of the Tunnels.150
21.Organization of Staff of Resident Engineer. Organization After the Tunnels Had Been Holed Through.151