Better Gutenberg
Free, beautifully formatted public-domain ebooks
‹Better GutenbergWebster’s Practical ForestryChapter XXXII — Prices of Contract or Piecework · 65 of 67Contents›

Webster’s Practical Forestry

by A. D. Webster

65 of 67 · Contents · Download EPUB

Chapter XXXII Prices of Contract or Piecework

The following prices may be taken as approximating to those paid generally throughout the country previous to the war.

It may be well to remember, however, that in districts where unusually high or low wages are paid, so in proportion will be the contract prices for the various classes of work.

BARKING OAK:s.d.s.d.
Barkingoakper ton210
Loadingbark on wagons″30
Barkingoak per ton of bark300
Choppingbark″80to100
COPPICEWOOD:
Cuttingout hurdle rodsper score01
″hurdle stakesper dozen01
″rake stems″01
″spade stems″01
″spick gads″01
″dahlia stakes″01
″rose stakesper two dozen01
″besom handles″01
″kidney-bean stakes50 in bundle02
″pea stakesper bundle01
″birchwood for besoms″01
DRAINING:s.d.s.d.
Pipedraining,mains, 4 ft. 3 in. deep,
4 in. or 6 in. pipesper chain30to36
″″small, 4 ft. deep, 1½ in.
to 3 in. pipes″20″29
″″small, 4 ft. deep, 1½ in. pipes″19″26
Ditches,open,36 in. wide at top, 30 in. deep,
and 9 in. wide at bottomper chain30to40
Scouring out ditto″09″10
Small openditches,15 in. to 18 in.wide at top,
12 in. to 15 in. deep, and 9 in.
wide at bottom″16″26
Scouring out ditto″06″09
FAGGOT-MAKING:s.d.
Makingfaggotsper 10046
″oven faggots″30
″faggots for fire-lighting″13
Cuttingbands for tying faggots″04
FELLING AND STUBBING TIMBER:s.d.s.d.
Fellingoak timberper tonof 40 ft.30
″other hardwoods″″26
″pinewood″″16to19
Stubbingout timber″″36″40
Cuttingunderwood from 12 to 15 years’ growthper acre96″120
FENCING:s.d.s.d.
Settingout andmortising4-holedpostsper score40
″″″3-holed″″30
″″″2-holed″″26
″″″1-holed″″20
″and cleaving rails″010
″″″stakes″06
″″″long poles″06
″″″short poles″04
Hanging field-gateseach40to50
Fixing stile″20
Preparing posts, rails and pails for tree guardsper set09
Fixing ditto″20
Six-wire fence larch posts and creosotedper chain350to400
Fixing same″46″50
FIREWOOD:s.d.s.d.
Splittingfirewoodper cord40to60
″″for charcoal″26″30
Cutting and stackingcordwood″20″30
Burningcharcoalper bushelof 20 lbs.02
Loading and spreading soilper load05″06
GATE-MAKING:s.d.s.d.
Field gate, oak5-bar170
Postsper pair230
Iron fastening and ironwork complete59
″ Fixing46
Making 5-bar oak gate26
″ half gate19
″ rough wickets20
″ wrought wickets30
Sawing hardwoodper 100 ft.36to40
″softwood″ ″26″30
HEDGING:s.d.s.d.
Trimming hedges, ordinary sizeper chain09to16
Making bank for quick hedge,
digging ditch and planting quick″76″106
″hedge, without bank or ditch, trenching
ground, preparing bed and planting″30″40
Cleaning young hedges″08″09
Laying hedge and scouring out ditch″20″30
HURDLE-MAKING:s.d.s.d.
Makinghurdlesper dozen36to40
″cattle hurdles (wattle)″50″60
″Welsh hurdles, for sheep″40″50
PITTING:
Diggingout clayper yard06
″holes for tree planting, 15 in.
in diameter and 15 in. deepper 10016to26
Inserting plants″06″10
Notch planting″20″30
PREPARING ROAD MATERIAL:
Quarrying stonesper yard010to13
Breaking stones for roads″08″10

← Back to Webster’s Practical Forestry

Scroll to Top